| Check | Why it matters | This app |
|---|---|---|
| One branch vs point tree | MDP, subpanels, and RTUs each need a current | Free: one point; Pro: unlimited tree |
| Known current at a node | Utility letter mid-system should continue downstream | Pro unlock |
| SCCR / AIC pass-fail | Nameplate must cover available current at the point | Free compare; Pro equipment list |
| 110.24 label / PDF | Inspectors ask for value, date, and documented calc | Pro labels and method report |
| Offline | Jobsite signal is uneven | Built for offline |
| Pricing model | Quiet Pro upgrades and subscriptions frustrate field use | One free point; one-time Pro; no subscription |
| Method family | US/CA point-to-point vs IEC 60909 | Point-to-point in this version; IEC not shipped |
We do not target competitor brand names in titles. Read features and pricing. For GB/IE prospective fault current language, see FAQ.
