How it works

From utility data to a point current in one pass

Match the product flow: system, source, transformer, run, result, then optional add point or label.

Fault Current & SCCR Label
  1. System. Pick NEC or CEC on first launch. Set three-phase or single-phase and the line voltage.
  2. Source. Use a utility available fault current letter on the primary or secondary, or model an infinite bus.
  3. Transformer. Enter kVA, secondary voltage, and %Z. Optionally apply impedance tolerance for a worse-case available current.
  4. Feeder run. Material, raceway, conductor size, parallels, and length. The app applies published C values for the point-to-point method.
  5. Result. Read available fault current in A and kA. Compare one AIC or SCCR. With Pro, add the next point on the tree, start from a known node current, add motors, or open a 110.24 label.

Related: point-to-point guide · tolerance boost · fit quiz.